SAFETY IS OUR BUSINESS
Temporary Solutions
Our temporary steel barriers deliver unique absorbing technology to manage the energy of errant vehicles by a combination of self-weight, catenary action, and the mass of the impacting vehicle on the products foot section, which limits barrier deflection.
Installation is safe and quicker with the integrated speed joints and using the innovative Asset Drilling Rig provides installation with zero Hand Arm Vibration.
Temporary precast concrete VRS enables you to meet the most stringent safety specifications for the works scheme over structures and where space is at a premium. Delivering up to H4a W4 under EN1317-2 tests.
Zoneguard
The lowest deflecting portable steel highway barrier in the world, Zoneguard provides the ultimate protection for installers, roadworkers and passing public.
Varioguard
Varioguard can be installed using the Asset Drilling Rig, providing ZERO Hand Arm Vibration, with up to 3000m drilled and fixed per shift and is fully tested to EN1317-2: N2W3, N2W4, N2W5, N2W6 and H1W6.
Vecu-Stop
Vecu-Stop attenuator system is based on more than fifty years of experience in designing road restraint systems.
Ideal for use with Asset Temporary VRS such as Zoneguard, Varioguard and Rebloc. Vecu-Stop crash cushions protect both road workers and users on temporary installations tested to EN1317-2 up.
Works Safety Gates
The Works Safety Gate (WSG) significantly reduces the danger faced by road workers when adjacent to works access points.
WSG maintains a secure and safe environment at all times during the works.
Rebloc
Patented REBLOC technology enables you to meet the most stringent safety specifications and offers a wide-ranging system.
The Rebloc range covers a broad containment level spectrum. All products can be connected to other VRS within the Asset range.
Quest™ CEN 110
The Quest™ CEN 110 attenuator system has been successfully tested using EN 1317-3 criteria for 110 km/h, 100 km/h and 80 km/h levels.
Multibloc and Maxibloc
Concrete barrier solutions specifically designed to provide a safe environment from vehicles and protect property.
Case Studies
Zoneguard – M6 J16-19 Smart Motorway
The M6 Junctions 16-19 Smart Motorway All Lanes Running (ALR) Project covers an 18 mile stretch of motorway used by 132,000+ vehicles per day – 92 vehicles per minute.
Overnight Installation of Asset Zoneguard A14 Kettering
Asset International, one of the Hill & Smith Plc. group of companies, recently completed their first UK installation of Zoneguard temporary steel barrier on the Kettering A14 stretch of highway.